June, 2012
Start of Construction of the Ondjiva Power Plant
After green field consignation of the site, the construction of the Ondjiva Plant was started, headed by the WinPower, Zagope and Grupo Gema Consortium. The Ondjiva Plant was designed using the modular technology known as BOOST System. The plant was designed to produce 10 MW, being comprised of 3 MAN 18V28/ 32S generator groups with a BOOST Powerbox configuration.