June, 2012
Start of Construction of the Dundo Power
After green field consignation of the site, the construction of the Dundo Plant was started, headed by the WinPower, Zagope and Grupo Gema Consortium. The Dundo Plant was designed using the modular technology known as BOOST System. The plant was designed to produce 30 MW, being comprised of 8 MAN 18V28/ 32S generator groups with a BOOST Powerbox configuration. The plant will be able to supply, at maximum capacity, the annual energy demands of 850 thousand inhabitants (considering the Angolan per capita consumption).